On the Critical Path

On the Critical Path

On the Critical Path


(7 desde 1 usuarios)

0h 22m 1971 HD

On the Critical Path en Cuevana. Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

On the Critical Path (1971)
Tags:   #On the Critical Path 1971   #On the Critical Path cuevana   #On the Critical Path cuevana 3   #On the Critical Path películas   #On the Critical Path pelicula completa   #On the Critical Path online español   #On the Critical Path online latino   #On the Critical Path gratis   # On the Critical Path online en español latino   #On the Critical Path película completa online   #ONF | NFB   #nuclear power   #candu

Comentario

User

Relacionados